The hold, fastener, panel and supporting structure work together. Match the whole system before you install.
Before you build: These guides help you plan; they are not a structural design or installation certification. Have a qualified builder or engineer review the structure, attachments and landing area. Use the instructions for your exact hold and hardware.
Know what is in your pack
“Hardware included” and “holds only” are separate pack choices. Read the selected product description rather than assuming every bolt-on pack includes bolts and T-nuts. Screw-on mounting uses different fasteners.
Bolts and T-nuts
Match the thread, diameter, head and length to the hold and mounting system. Begin threading by hand. Stop if it binds: the hardware may be misaligned or incompatible. Do not force a bolt through a damaged or spinning T-nut.
Watch: installing a T-nut
For bolt-on holds only. Screw-on holds do not use T-nuts.
Screws
Use the fastener specification for the exact screw-on hold and mounting material. Check both engagement into the wood and clearance behind it. A fastener selected for an unrelated household repair is not automatically appropriate for a climbing hold.
Outdoor installations
Exposure changes maintenance needs. Rocky notes that its supplied hardware may show rust when left in weather. Ask the hardware supplier to specify compatible materials for the location and follow their inspection and lubrication instructions. Keep access to the rear of the wall.
Keep the specifications together
- Hold model and mounting style
- Fastener type, dimensions and finish
- Panel and support details
- Installation instructions and inspection dates